|
Simply create what you want in minutes.
For example:
1. Right surface jet, left wall jet for that Algae problem 3 down jets for efficiency
2. Left surface jet, right surface jet for that dead cove that was missed at construction 4 down jets for
efficiency
For
detailed instructions

This eye ball fitting was designed for the times we live in; high power bills, chemicals, cost to replace equipment and heating cost. Operation costs are cut dramatically! Sales advantage on new construction is
phenomenal!
|